Receives Results From Mallina Process Design Study –

De Grey Mining: Receives Results From Mallina Process Design Study –

De Grey Mining ReceivesResults starting at Mallina process design study

  • De Grey Mining (DEG) receives results for two important process flowsheet selections for its MallinaThe gold project, which includes the Hemi DepositIn Western Australia
  • The Nine are required to create flowsheets.-Month trade-Pre-study into the preferred design process for your project-Process engineer for feasibility study (PFS). Wood Australia
  • De Grey says process flowsheet selections — comminution circuit and oxidation circuit — represent the best technical, environmental and economic outcomes for its plant
  • EachThe flowsheets represent key inputs to a planned PFS. MallinaThis is due in the SeptemberQuarter of 2022
  • De Grey Shares are up 1.26 percent and trading at 96c per share at 12.42 AEST

Leave a Comment